Announcement of Bidding for Highway Construction Projects of the 2019 Financial Special Poverty Alleviation Fund Project (Third Batch) of Zhulinwan Village, Longshan Town
  • 来源:龙山镇人民政府 阅读次数:1207 【打印本页】 关闭窗口 Release time: 2019-11-18 Source: People's Government of Longshan Town Reads: 1207 [Print this page] [ Close window ]

2019年财政 专项 扶贫资金项目 2019 Financial Special Poverty Alleviation Project of Zhulinwan Village , Longshan Town

第三批) 公路建设工程招标 公告 ( Third Batch) Announcement of Bidding for Highway Construction Projects


201 9 年财政 专项 扶贫资金项目 (第三批)公路建设工程 龙头村 委托 公开邀请有专业资质的施工单位参与本项目的 选择 ,现将有关事项公告如下: The 2009 9th financial special poverty alleviation fund project (the third batch) of Zhulinwan Village, Longshan Town, Zizhong County was commissioned by Longtou Village to openly invite professionally qualified construction units to participate in the selection of this project. The relevant matters are now announced as follows:

: I. Project Overview :

专项 扶贫资金项目 (第三批)公路建设工程 1. Project name: Zhulinwan Village, Longshan Town, 2019 Special Financial Poverty Alleviation Fund Project (Third Batch) Highway Construction Project .

龙头村村委会 2. Project owner: Longtou Village Village Committee of Longshan Town .

1.225 公里, 路基宽为 4.5米 3. Construction Content: The newly-built 3.5-meter wide cement highway will be 1.225 kilometers long and the width of the soil roadbed will be 4.5 meters . 3.7米,厚0.16米 水泥路面宽 3.5米,厚0.18米。 The effective road surface is 3.7 meters wide and 0.16 meters thick ; the cement road is 3.5 meters wide and 0.18 meters thick. The specific project quality and project content are subject to the design documents provided by Party A.

73.0 万元,其中财政资金 58.0 万元,社会资金投入(含农户自筹)资金 15.0 万元。 4. The total investment of the project budget is 730 thousand yuan, of which the financial fund is 580 thousand yuan, and the social capital investment (including self-raised by farmers) is 150 thousand yuan. ,不超过预算总投资 The specific project price is settled on the basis of financial review funds and does not exceed the total budget investment .

5. Construction site: Zhulinwan Village, Longshan Town.

9 12 月底完成。 6. Requirement of construction period: completed at the end of December, 2009.

Qualification requirements

1. Must have the status of an independent legal person.

公路 工程施工总承包三级及以上资质。 2. Qualified for Grade III and above in highway engineering construction general contracting.

3. The person in charge of engineering technology has the qualification of second-class construction engineer or above .

3. Publicity and registration time

3个工作日,201 9 11 18 日至 11 20 日。 The publicity time is 3 working days, from November 18 to November 20 , 2011.

1天,201 9 11 21 日(北京时间上午 9:00-12:00,下午14:30-18:00),逾期不予受理。 The registration time is 1 day, November 21 , 201 (Beijing time 9: 00-12: 00, 14: 30-18: 00). Late registration will not be accepted.

Application methods and qualification requirements

Enterprises that meet the above conditions should apply at the Longshan Town Comprehensive Office. Also bring the following supporting documents:

1. The original copy of the business license of the enterprise legal person and a photo stamped with fresh seals, leaving a copy;

2. A copy of the original copy of the safety production license and a copy stamped with fresh seals, leaving a copy;

3. The original letter of authorization or letter of introduction of the legal person, the original and copy of the ID card of the authorized agent;

技术负责人资格证复印件 4. A copy of the qualification certificate of the person in charge of technology ;

、交纳 标保证金缴费凭证; 5. Payment voucher for payment of bid security deposit;

、拟参加竞选的施工队伍需向龙山镇财政所缴纳 3.0 万元 标保证金。 6. The construction team planning to participate in the election shall pay a deposit of RMB 30, 000 to the Longshan Town Finance Office . (不计利息) ,中标单位所缴纳的投标保证金可转为履约保证金并据实清算 The bid deposit shall be fully refunded after the project implementation entity signs the contract with the construction unit (excluding interest) . The bid deposit paid by the successful bidder may be converted into a performance bond and liquidated .

V. Selection method of construction team

1. Construction enterprises that have passed the qualification review will be notified separately of the time and place for the construction unit to choose the conference. The procedure is: under the on-site supervision of the county-level relevant departments, towns and project village representatives, the representatives selected by the project village will first extract the construction unit from the construction team that has passed the compliance review and paid the bid deposit in full and on time. Sort, and then randomly select 1 house in three times as the construction team. The construction team drawn for the first time is taken as the first candidate, the second drawn for the second candidate, and the third drawn for the third candidate.

2. If there are less than 3 construction teams that have passed the compliance review and paid the bid deposit in full and on time, issue a second announcement. If the number of construction teams that have registered and passed the compliance review after the second announcement is still less than Three companies will be dealt with according to different situations: (1) When there are two construction teams that have passed the compliance review and paid the bid deposit in full and on time, two construction teams will be randomly selected each time as the candidate construction team. The construction team drawn for the first time is the first candidate, and the second drawn is the second candidate. (2) If there is one construction team that has passed the compliance review and has paid the bid deposit in full and on time, the construction team can be directly determined as a candidate after the project implementation entity submits a written application and reports to the township and county authorities. Construction team.

3. Determination of the selected construction team: The project implementation subject shall publicize the extraction results in the project area, and the publicity period shall be no less than 3 working days. 队伍 ,并由项目实施主体发出《中选通知书》。 After the publicity period expires, the first candidate is the selected construction team , and the project implementation body issues a "Notice of Selection ". 队伍 ,以此类推。 If the first candidate abandons the selection for unjustified reasons such as funds, technology, and construction period, the bid security deposit paid by him will be confiscated, the second candidate will become the selected construction team and so on.

单位 签订合同。 4. Signing of contract and payment of performance bond: The project implementation entity shall sign a contract with the construction unit within 10 days of the issuance of the selection notice . 单位 应在签订合同后的 5日内,按不低于合同金额的8%缴纳履约保证金。 The construction unit shall, within 5 days after signing the contract, pay a performance bond at no less than 8% of the contract amount. The performance fund shall be managed by the town finance agency and shall be paid according to the contract.

投标 保证金缴纳方式 Payment method of bid security

2019年11月 21 下午 18 00时 1. The deadline for the payment of bid security deposit is 18:00 on November 21 , 2019 ;

保证金收款单位:资中县龙山镇财政所 2. Tender deposit collection unit: Longshan Town Finance Office , Zizhong County ;

开户行:资中县农村信用合作联社龙山分社 3. Account opening bank: Longshan Branch of Zizhong County Rural Credit Cooperatives ;

银行账号: 88100120002535801 4. Bank account number: 88100120002535801 ;

、资金 名称 :龙山镇竹林湾村 2019年财政 专项 扶贫资金项目 (第三批)公路建设工程 投标保证金 5. Name of fund : Zhulinwan Village , Longshan Town, 2019 Special Financial Poverty Alleviation Fund Project (Third Batch) Road Construction Project Bid Deposit

联系方式 Contact Information

先生 Contact: Mr. Tang

0832-5370312; Phone: 0832-5370312;

 

People's Government of Longshan Town, Zizhong County

9 11 18 201 November 18 , 9



Attachment: Zhulinwan Village Tender Notice (Third Batch) .doc